logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Admiralty Station Fourway Interchange Planning Through To Preliminary Design Stephen Robinson

  • SKU: BELL-237441602
Admiralty Station Fourway Interchange Planning Through To Preliminary Design Stephen Robinson
$ 35.00 $ 45.00 (-22%)

0.0

0 reviews

Admiralty Station Fourway Interchange Planning Through To Preliminary Design Stephen Robinson instant download after payment.

Publisher: The Hong Kong Institution of Engineers
File Extension: PDF
File size: 4.18 MB
Pages: 10
Author: Stephen Robinson, Jack Yuk Lam Li, Wai Tat Wong
ISBN: 10.33430/V31N1THIE-2022-0048
Language: English
Year: 2024

Product desciption

Admiralty Station Fourway Interchange Planning Through To Preliminary Design Stephen Robinson by Stephen Robinson, Jack Yuk Lam Li, Wai Tat Wong 10.33430/V31N1THIE-2022-0048 instant download after payment.

ABSTRACT

Admiralty Station (ADM) has been the busiest station on the Hong Kong rail network since the opening of the Island Line (ISL), with its cross-platform interchange to the Tsuen Wan Line (TWL). This two-way interchange station has now become an even busier four-way interchange, following the completion of the South Island Line (SIL) and the Shatin-to-Central Link (SCL). This paper gives some of the history of these two new lines and describes the various schemes for interchange at Admiralty, leading to the arrangement developed in the Preliminary Design, which was adopted. The main planning objective for the expanded Admiralty Station was to make interchanges between the four lines as convenient as possible, with sufficient capacity and space to avoid over-crowding. A secondary objective was that the works for the SIL and SCL should avoid any significant effects on the operation of the ISL and TWL during construction. The expansion of ADM was completed in two stages, with the South Island Line opening in December 2016, and the Shatin-to-Central Link (North South Line), opening in May 2022. It is observed that the railway system is operating smoothly, and the interchange arrangement has been well received by the public.

Related Products

Admiralty Poul Anderson

4.4

92 reviews
$45.00 $35.00
Admiralty Poul Anderson

4.0

56 reviews
$45.00 $35.00