logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Airfield Safety And Capacity Improvements Case Studies On Successful Projects Geoff Baskir

  • SKU: BELL-4633256
Airfield Safety And Capacity Improvements Case Studies On Successful Projects Geoff Baskir
$ 31.00 $ 45.00 (-31%)

5.0

38 reviews

Airfield Safety And Capacity Improvements Case Studies On Successful Projects Geoff Baskir instant download after payment.

Publisher: Amer Society of Civil Engineers
File Extension: PDF
File size: 9.05 MB
Pages: 104
Author: Geoff Baskir, Geoff Baskir, Edward L. Gervais
ISBN: 9780784412565, 9780784477045, 9780784477458, 0784412561, 0784477043, 0784477450
Language: English
Year: 2012

Product desciption

Airfield Safety And Capacity Improvements Case Studies On Successful Projects Geoff Baskir by Geoff Baskir, Geoff Baskir, Edward L. Gervais 9780784412565, 9780784477045, 9780784477458, 0784412561, 0784477043, 0784477450 instant download after payment.

Airfield Safety and Capacity Improvements: Case Studies on Successful Projects presents six case studies focused on the planning, engineering, and management of major construction projects at active airports. The construction or reconstruction of runways, aprons, ramps, or terminals while an airport is open for regular operations poses complex challenges, such as access to and from airport operating areas, logistics, staging, short-term lighting and signage, airline-airport communications, and staging and planning for short-term closures of taxiways and taxi lanes. Each case study describes the requirements, objectives, challenges, methodologies, and lessons learned from a recent project, offering unique insights into how complex projects can be managed successfully. Topics include the following: New Delhi Indira Gandhi International Airport runway design and construction; Seattle-Tacoma International Airport reconstruction of runway 16L-34R; George Bush Intercontinental Airport rehabilitation of runway 09-27; John F. Kennedy International Airport reconstruction of runway 13R-31L; Los Angeles International Airport coordinated logistics management; and Denver International Airport off-peak construction. These case studies are essential reading for those involved in planning, designing, and constructing capital improvements to airport facilities, including transportation and aviation engineers, construction engineers and project managers, and managers with airport authorities

Related Products