logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Construction Scheduling Cost Optimization And Management A New Model Based On Neurocomputing And Object Technologies 1st Edition Hojjat Adeli

  • SKU: BELL-1185484
Construction Scheduling Cost Optimization And Management A New Model Based On Neurocomputing And Object Technologies 1st Edition Hojjat Adeli
$ 31.00 $ 45.00 (-31%)

4.0

46 reviews

Construction Scheduling Cost Optimization And Management A New Model Based On Neurocomputing And Object Technologies 1st Edition Hojjat Adeli instant download after payment.

Publisher: Spon Press
File Extension: PDF
File size: 4.8 MB
Pages: 178
Author: Hojjat Adeli, Asim Karim
ISBN: 9780203302231, 9780203355930, 9780415244176, 0203302230, 041524417X, 0203355938
Language: English
Year: 2001
Edition: 1

Product desciption

Construction Scheduling Cost Optimization And Management A New Model Based On Neurocomputing And Object Technologies 1st Edition Hojjat Adeli by Hojjat Adeli, Asim Karim 9780203302231, 9780203355930, 9780415244176, 0203302230, 041524417X, 0203355938 instant download after payment.

Presents a general methematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and and cost optimization.

Related Products