logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Cost Estimation For Decommissioning An International Overview Of Cost Elements Estimation Practices And Reporting Requirements Oecd

  • SKU: BELL-6772098
Cost Estimation For Decommissioning An International Overview Of Cost Elements Estimation Practices And Reporting Requirements Oecd
$ 31.00 $ 45.00 (-31%)

5.0

60 reviews

Cost Estimation For Decommissioning An International Overview Of Cost Elements Estimation Practices And Reporting Requirements Oecd instant download after payment.

Publisher: OECD Publishing
File Extension: PDF
File size: 1.32 MB
Pages: 80
Author: OECD
ISBN: 9789264106864, 9789264991330, 9264106863, 9264991336
Language: English
Year: 2010

Product desciption

Cost Estimation For Decommissioning An International Overview Of Cost Elements Estimation Practices And Reporting Requirements Oecd by Oecd 9789264106864, 9789264991330, 9264106863, 9264991336 instant download after payment.

This report is based on a study carried out by the NEA Decommissioning Cost Estimation Group (DCEG) on decommissioning cost elements, estimation practices and reporting requirements. Its findings indicate that cost methodologies need to be updated continuously using cost data from actual decommissioning projects and hence, systematic approaches need to be implemented to collect these data. The study also concludes that changes in project scope may have the greatest impact on project costs. Such changes must therefore be identified immediately and incorporated into the estimate. Finally, the report notes that more needs to be done to facilitate the comparison of estimates, for example by providing a reporting template for national estimates. 

Related Products