logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Le Corbusier Pierre Jeanneret Restoration Of The Clart Building Geneva Office Du Patrimoine Et Des Sites Editor

  • SKU: BELL-51928350
Le Corbusier Pierre Jeanneret Restoration Of The Clart Building Geneva Office Du Patrimoine Et Des Sites Editor
$ 31.00 $ 45.00 (-31%)

4.4

82 reviews

Le Corbusier Pierre Jeanneret Restoration Of The Clart Building Geneva Office Du Patrimoine Et Des Sites Editor instant download after payment.

Publisher: Birkhäuser
File Extension: PDF
File size: 21.86 MB
Pages: 176
Author: Office du patrimoine et des sites (editor)
ISBN: 9783035607598, 3035607591
Language: English
Year: 2016

Product desciption

Le Corbusier Pierre Jeanneret Restoration Of The Clart Building Geneva Office Du Patrimoine Et Des Sites Editor by Office Du Patrimoine Et Des Sites (editor) 9783035607598, 3035607591 instant download after payment.

Immeuble Clarté renovated


The book describes the story of Clarté, Le Corbusier’s first apartment building, continuing the narrative into the 21st century. The steel skeleton building completed in Geneva in 1930/1932 is a prototype of the Moderne style and a precursor of the Unité d’Habitation.


The building was neglected for many decades and not listed as a historic building until the 1990s. In 2007 the external envelope was repaired as the first step, followed by refurbishment of the interior, in which building preservation requirements were taken into account in an exemplary manner. The building log book by the architects and structural engineers is illustrated with numerous new and historic drawings and photographs, and has been supplemented with an account of the building’s history. The renovated building is presented in large photographs.



  • Listed among UNESCO World Heritage sites since 2016

  • Extensive building log book of the refurbishment process and current architectural photographs

  • Numerous sketches, drawings and photographs from the time of the construction of the building

Related Products