logo

EbookBell.com

Most ebook files are in PDF format, so you can easily read them using various software such as Foxit Reader or directly on the Google Chrome browser.
Some ebook files are released by publishers in other formats such as .awz, .mobi, .epub, .fb2, etc. You may need to install specific software to read these formats on mobile/PC, such as Calibre.

Please read the tutorial at this link:  https://ebookbell.com/faq 


We offer FREE conversion to the popular formats you request; however, this may take some time. Therefore, right after payment, please email us, and we will try to provide the service as quickly as possible.


For some exceptional file formats or broken links (if any), please refrain from opening any disputes. Instead, email us first, and we will try to assist within a maximum of 6 hours.

EbookBell Team

Waste Reduction In Precast Construction Using Lean And Shared Mental Models 1st Ed Joy Ong

  • SKU: BELL-22473992
Waste Reduction In Precast Construction Using Lean And Shared Mental Models 1st Ed Joy Ong
$ 31.00 $ 45.00 (-31%)

4.8

104 reviews

Waste Reduction In Precast Construction Using Lean And Shared Mental Models 1st Ed Joy Ong instant download after payment.

Publisher: Springer Singapore;Springer
File Extension: PDF
File size: 4.54 MB
Author: Joy Ong, Low Sui Pheng
ISBN: 9789811587986, 9789811587993, 9811587981, 981158799X
Language: English
Year: 2021
Edition: 1st ed.

Product desciption

Waste Reduction In Precast Construction Using Lean And Shared Mental Models 1st Ed Joy Ong by Joy Ong, Low Sui Pheng 9789811587986, 9789811587993, 9811587981, 981158799X instant download after payment.

This book presents the adaptation of lean principles to the precast construction industry to eliminate or minimize construction wastes, by modeling the precast construction process influencing manpower requirements. This is done using the shared mental models theory to understand how the lean principles enable people to work together to complete the tasks and work together effectively as a team throughout the entire precast construction process from the design, production and logistics to installation stages. Besides the theoretical concepts, this proposed book also presents the practical aspects faced by contractors through the conduct of questionnaire surveys to understand how the implementation of lean principles and shared mental models will affect the occurrence of construction wastes and hence the changes in the total man days used during the precast construction process. This book also presents a neural network model for developing leading indicators that classify precast construction projects in accordance with the manpower changes achieved through the construct of lean principles and shared mental models. This is to help the construction industry to predict the risk of low construction productivity and enable effective lean implementation to optimize the manpower effort required.

Related Products